Receive support of up to 45% for the acquisition of a PV system and an additional 30% for the implementation of battery storage and EMS.

The State Environmental Fund of the Czech Republic will launch, from 15 December 2025, a new subsidy programme providing financial support for energy communities implementing projects for the production of renewable electricity consumed at the place of its generation.

Would you like to take advantage of this subsidy? We will be happy to handle the whole process for you. Simply contact us via the inquiry form.

The call for the programme KOMUNERG No. 1/2025 – Development of Energy Communities was announced under the European Union’s Modernisation Fund.

Who can apply for the subsidy?

  • energy communities (e.g., municipalities and associations of municipalities, community associations, etc.)

What is the subsidy intended for?

Acquisition of new renewable energy sources:
  • photovoltaic power plants
  • battery storage systems
  • wind turbines
  • biogas/biomass cogeneration units

Non-production measures:

  • measurement and monitoring systems
  • equipment and software for electricity production and consumption control
  • energy management systems and consumption control systems
  • IT solutions and control applications
  • battery storage systems
  • charging stations for electric vehicles
  • project preparation

What will we handle for you?

In addition to the subsidy application itself, we will manage all related paperwork:

  • submission of the subsidy application
  • project documentation
  • application for connection to the distribution grid
  • energy assessment
  • preparation of the PV installation and battery storage implementation
  • communication with authorities (including administration)
  • and more.

Key information about the programme

Application submission period

15 December 2025 – 31 December 2027, or until the allocation is exhausted

Maximum subsidy amount

45% for new renewable energy sources
30% for non-production measures

Total allocation

1 billion CZK

Form of support

non-repayable subsidy
preferential loan with a maturity of 5 to 10 years
a combination of both forms

Condition

own consumption

Implementation period

max. 5 years from the date of the decision

The project must include demonstrable integration of new or existing renewable electricity sources into a sharing system within an energy community located in the territory of a maximum of three neighbouring municipalities with extended powers, or within the territory of Prague.

Do you have any questions about this subsidy programme? Write to us using the form below.